Case Study

Woodland Baptist church

Industry

Project Location

Waynesville, NC

Project Scope

25,508 SF New Church

Cooper Construction built the church for Woodland Baptist Church on Crabtree Road in Waynesville, North Carolina.

The building is 25,508 square feet, a Varco-Pruden pre-engineered structure faced in six inch split-faced block with a water table. Inside are a baptistery with its own fill and drain system and a hundred lay-in fixtures lighting the sanctuary.

Waynesville is an hour west of Cooper's office in Flat Rock.

Start your Project Today

Contact Us